Backup Storage Prices

Price history

What has changed in object storage pricing, and when we saw it

Prices checked

Recorded storage prices

101 saved price checks from 26 July 2026 to 6 November 2026: 2 of 18 vendors' recorded storage prices changed in that time: Hetzner Object Storage, Akamai Cloud Object Storage.

One class and region per vendor: its storage price per GB or GiB a month in each saved check, with any monthly fee and the storage that fee or a free allowance includes. These are dated observations, not current quotes; a gap means no numeric rate was recorded that day.

Follow new changes in a feed reader: RSS feed or JSON feed. Each entry is a change a check recorded, with the old and new price and what keeping 10 TB cost before and after.

Prices that changed

Each date is the day a check first recorded the new price, not the day the vendor changed it.

Hetzner Object Storage

Object Storage · Falkenstein · US dollars a month

  • : was $5.99 a month with 1,000 GB included, then $0.00576 per GB; became $7.99 a month at most, billed by the hour, with 1 TB included, then $0.0123 per TB-hour beyond it. Keeping 10 TB went from $57.83 to $87.69 a month (storage only).
25 July 202617 October 2026
Every check and its price
CheckedStorage price a month
$5.99 a month with 1,000 GB included, then $0.00576 per GB
$7.99 a month at most, billed by the hour, with 1 TB included, then $0.0123 per TB-hour beyond it
$7.99 a month at most, billed by the hour, with 1 TB included, then $0.0123 per TB-hour beyond it
$7.99 a month at most, billed by the hour, with 1 TB included, then $0.0123 per TB-hour beyond it
$7.99 a month at most, billed by the hour, with 1 TB included, then $0.0123 per TB-hour beyond it

Akamai Cloud Object Storage

Object Storage · US East · US dollars a month

  • : was $5 a month with 250 GB included, then $0.02 per GB; became $0.02 per GB, no monthly fee. Keeping 10 TB cost $200.00 a month either way.
  • : was $0.02 per GB; became $5 a month with 250 GB included, then $0.02 per GB. Keeping 10 TB cost $200.00 a month either way.

The 27 September 2026 check read only Akamai's price table and missed its $5 flat rate with 250 GB included, which Akamai's pricing page still states: Akamai's price did not change. Corrected on 23 October 2026.

Every check and its price
CheckedStorage price a month
$5 a month with 250 GB included, then $0.02 per GB
$5 a month with 250 GB included, then $0.02 per GB
$0.02 per GB
$5 a month with 250 GB included, then $0.02 per GB

Prices that held

Storage prices with no recorded change
VendorClass and regionStorage price a monthRecorded
Amazon S3S3 Standard, US East (N. Virginia)$0.023 per GB to
Azure Blob StorageHot LRS, East US$0.0208 per GB to
Google Cloud StorageStandard, South Carolina$0.02 per GiB to
Cloudflare R2Standard, Global$0.015 per GB to
Backblaze B2B2 Cloud Storage, US WestFirst 10 GB free, then $0.00695 per GB to
WasabiHot Cloud Storage, US East 1$0.007803 per GB to
IDrive e2IDrive e2, Virginia$0.006 per GB to
DigitalOcean SpacesSpaces Standard Storage, New York 3$5 a month with 250 GiB included, then $0.02 per GiB to
Scaleway Object StorageStandard Multi-AZ, Paris€0.01606 per GB to
OVHcloud Object StorageStandard 3-AZ, France (Paris)$0.01571 per GiB to
Vultr Object StorageStandard, New Jersey$18 a month with 1,000 GB included, then $0.018 per GB to
StorjStandard, Globally distributed$0.007 per GB, at least $5 a month to
Oracle OCI Object StorageStandard, US East (Ashburn)First 10 GB free, then $0.0255 per GB to
TigrisStandard, Global$0.02 per GiB to
FilebaseObject Storage, Global$7.50 a month with 500 GiB included, then $0.015 per GiB to
Telnyx Cloud StorageRegular Storage, US EastFirst 10 GiB free, then $0.006 per GiB to

A dated history of changes to storage, retrieval, request, constraint, and egress rules. Our price history starts on 26 July 2026. Earlier changes are cited from vendor announcements and are never presented as changes we saw ourselves.

Put your own numbers through the calculator to see what this charge does to a normal month and to the month you restore.

Our price history starts on 26 July 2026

We first saved every vendor's prices at 00:35 UTC on 26 July 2026: 61 region-specific offers across 18 vendors. That save is where our price history begins. [1]

A second save at 01:52 UTC, compared against the first, found zero changes across the 12 price details we track. Zero is the number of changes we saw in that interval, not a claim that prices never changed before we began checking. [2]

The Wasabi and Backblaze moves shown below predate our first save. They are included because each vendor published the old value, new value, and effective date. Each rests on the vendor's own announcement rather than on a price we saw ourselves, so there is no first-seen date to state, and we cannot say how they affect a standard-workload winner. [3] [4] [1]

Our price history starts on 26 July 2026
Where this comes fromDateWhat the date provesWhat it does not proveSource
Our own saved prices 2026-07-26T00:35:07Z We held the prices of all 61 offers at this time Any value before this time [1]
Our own saved prices 2026-07-26T01:52:49Z No tracked price detail changed between the two saves That no vendor changed prices before our history began [2]
Vendor announcement 2026-07-01 Wasabi applied its announced Pay as You Go pricing change on or after this date That we saw the change happen [3]
Vendor announcement 2026-05-01 Backblaze applied its announced B2 price and API changes on this date That we saw the change happen [4]

Twelve price details are checked for every offer

Price history compares 12 billing details on each of the 66 checked offers. These are the details most likely to move a bill, not a claim that a complete bill contains only 12 concepts. [5] [6]

Each dated offer keeps its storage class and region together. AWS, Azure, and Telnyx reuse class names across regions, so dropping the region could overwrite one price with another and hide a real change. [5] [6]

Each detail matters because a bill can change without the headline storage rate moving. An allowance, request schedule, retrieval choice, billing floor, or fixed fee can move the bill and the ranking on its own. [6]

Show the table (12 price details)
Twelve price details are checked for every offer
Price detailWhat is comparedWhat a change means for a readerSource
Storage price bands The full storage tier schedule Stored-capacity cost can move, including graduated bands [5] [6]
Minimum billed object size The billable size floor for each object Repositories with many small objects can be billed for more capacity than they contain [5] [6]
Minimum storage period The minimum age before a qualifying delete, overwrite, move, or transition Delete, overwrite, move, or transition timing can change the bill [5] [6]
Early-deletion calculation How the remaining minimum-duration charge is calculated The same early delete or overwrite can produce a different remainder charge [5] [6]
Minimum billed capacity The account, plan, or offer capacity floor A small repository can still receive the full floor charge [5] [6]
Free transfer allowance The fixed, proportional, bundled, or unlimited transfer allowance The point where downloaded bytes become paid or policy-limited can move [5] [6]
Internet transfer price bands The public-internet transfer schedule, or that it is not published A restore can become more expensive, remain free, or lose its complete published total [5] [6]
Retrieval price The representative retrieval rate Reading cold or infrequent data can change independently of egress [5] [6]
Retrieval choices and timing Named retrieval speeds, latencies, request prices, and byte rates A faster or slower recovery path can change both time and price [5] [6]
Class A requests Write, list, multipart, and other Class A rules Write-heavy backup activity can move the monthly total [5] [6]
Class B requests Read, metadata, and other Class B rules Restore, verification, and integrity-check traffic can move the monthly total [5] [6]
Fixed fees Monthly, account, or bundled-plan fees A base fee can change the winner even when usage rates do not [5] [6]

What each recorded price change shows

Each change keeps the provider, storage class, region, charge that moved, prior value, new value, first date seen, vendor source, and vendor effective date when one is published. Both values preserve the complete charge, including price bands and conditions, instead of reducing a rule to one headline number. [5]

First seen answers when this site observed the value. Effective date answers when the vendor says the rule took effect. Those dates can differ, and the page keeps both rather than moving an observation backward to match an announcement. [5]

When a vendor does not publish a rate, we say so. Not published does not mean free, a missing rate is never counted as zero, and a blank is not an acceptable answer. [7]

What each recorded price change shows
Change detailMeaningReader useSource
Provider, class, and region The exact regional offer that changed Prevents one region from being mistaken for another [5]
Charge or rule The charge or rule that moved Separates a storage change from egress, retrieval, request, floor, or fee changes [5]
Previous value The complete value in the previous saved check Shows the rule that an earlier estimate used [5]
New value The complete value in the newer saved check Shows the rule a current estimate uses [5]
First seen The UTC time at which we first saw the new value Marks the limit of what we can claim to have observed [5]
Vendor effective date The vendor-published effective date, or not published Distinguishes billing effect from collection time [5] [7]
Vendor source The vendor page or feed attached to the changed offer Lets the reader check the change against the vendor's own pages [5]

Two recent price changes, from vendor announcements

Wasabi's May 2026 pricing FAQ identifies the prior $6.99 per TB-month Pay as You Go plan, gives the new $7.99 per TB-month price, and says current customers see the change on the first billing cycle on or after 2026-07-01. The announcement also says free egress and API request policies were unchanged. [3]

Backblaze announced that B2 Pay as You Go storage would move from $6.00 to $6.95 per TB-month on 2026-05-01. It made standard API calls free on the same date and left its 3x free-egress rule unchanged. [4] [8]

We did not see either change ourselves, because both effective dates precede 2026-07-26. They remain useful context, but we cannot say how they affect the standard-workload winner because we never saved the earlier complete rates and rules. [1] [3] [4]

Two recent price changes, from vendor announcements
OfferChargeOld valueNew valueEffective dateSeen in our own checksSource
Wasabi Hot Cloud Storage, us-east-1 Storage price tiers $6.99 per TB-month $7.99 per TB-month 2026-07-01 Not seen by us; the vendor announcement predates our price history [3]
Backblaze B2 Cloud Storage, us-west-004 Storage price tiers $6.00 per TB-month $6.95 per TB-month 2026-05-01 Not seen by us; the vendor announcement predates our price history [4]

A storage move does not decide the winner by itself

Egress is the decision variable because moving stored data back to a user can outweigh the storage line. Backblaze includes public-internet egress up to 3x average monthly storage and then charges $0.01/GB, while Cloudflare R2 charges no egress but meters Class A and Class B operations. [8] [9] [10]

Wasabi charges no metered transfer at any volume. Monthly outbound traffic within the stored volume fits its guideline; for repeated excess, Wasabi reserves the right to limit or suspend the service. So the calculator here prices that excess at $0, as Wasabi bills it, with the policy beside it. [11]

A restore is read-only. Retrieval, restore and read requests, temporary-copy storage, and egress can apply, but reading does not create an early-deletion charge. Early deletion applies only when a separate action deletes, overwrites, moves, or transitions an object before its minimum duration. [12] [13] [11]

A storage move does not decide the winner by itself
Changed ruleWhat it means for youWhat still has to be checkedSource
Storage rate or tier The stored-capacity line changes Capacity floors, free storage, egress, retrieval, requests, fixed fees, and region [6]
Free-egress allowance The point where transfer becomes paid or policy-limited moves Whether the allowance uses average or active storage, its destination, and any overage rate [8] [11]
Class A or Class B schedule Backup writes, listings, reads, or checks can become cheaper or more expensive Actual request counts and class mapping [10] [4]
Retrieval rate or tier The cost or time to make cold data readable changes Egress, request count, destination, and temporary-copy duration [12] [13]
Minimum duration or early-deletion method An early delete, overwrite, move, or transition can change the remainder charge Object age and whether the workflow deletes, overwrites, moves, or transitions [13] [11]

Where vendor pages disagree

The current Backblaze pricing page and its 2026 announcement agree on $6.95 per TB-month, but the transaction-pricing page still says storage after the first 10 GB is $0.005/GB-month. We treat that storage note as out of date and do not use it for current storage pricing; the transaction page remains the source for the 3x egress allowance and $0.01/GB overage. [8] [4] [9]

Our July 25 check of Wasabi's prices did not include a minimum billed object size, while the current official FAQ says objects smaller than 4 KB are billed as 4 KB, and our current price table uses that 4 KB minimum. We leave the dated July observation as it was. [6] [11]

The May 2026 Wasabi announcement describes 20 percent of 1 TB as 100 GB in prose but uses 200 GB in its formula. We do not rely on that transfer example because it contradicts itself. The price-change claim does not depend on that example because the same announcement separately names the old plan, new price, and effective billing date. [3]

Where vendor pages disagree
PropertyOur price table or chosen sourceConflicting sourceWhat we didSource
Backblaze B2 storage rate $6.95 per TB-month $0.005/GB-month note on the transaction page Use the current pricing page and dated 2026 announcement; treat the transaction-page storage note as out of date [8] [4] [9]
Wasabi minimum billed object size No figure in our July 25 check 4 KB on the current official FAQ Use the 4 KB minimum now and keep the dated July observation intact [6] [11]
Wasabi announcement transfer example Old and new storage prices are stated separately The example labels 100 GB as 20 percent of 1 TB but calculates with 200 GB Do not use the transfer arithmetic; keep only the separately stated price move [3]

Sources

Every figure above comes from one of these pages, on the date shown. Each numbered reference in the text links to its entry here. Vendors change prices; if a date looks old, check the source. Three vendors publish a downloadable price feed and the rest are re-checked by hand, which is why the dates are not uniform.

Source pages checked 13 sources
  1. 1 Our price history backupstorageprices.com · checked 26 July 2026
  2. 2 Our price history backupstorageprices.com · checked 26 July 2026
  3. 3 Wasabi docs: May 2026 pricing FAQs docs.wasabi.com · checked 26 July 2026
  4. 4 Backblaze blog: Pricing and product updates www.backblaze.com · checked 26 July 2026
  5. 5 Our price history backupstorageprices.com · checked 26 July 2026
  6. 6 Our price table (all vendors) backupstorageprices.com · checked 26 July 2026
  7. 7 How we work out the bills backupstorageprices.com · checked 26 July 2026
  8. 8 Backblaze: B2 Cloud Storage pricing www.backblaze.com · checked 26 July 2026
  9. 9 Backblaze: B2 API pricing (Class A, B, C, D) www.backblaze.com · checked 26 July 2026
  10. 10 Cloudflare R2 docs: Pricing developers.cloudflare.com · checked 26 July 2026
  11. 11 Wasabi: Pay as you go pricing FAQs wasabi.com · checked 12 October 2026
  12. 12 Amazon S3 docs: Working with archived objects docs.aws.amazon.com · checked 26 July 2026
  13. 13 AWS: Amazon S3 pricing aws.amazon.com · checked 26 July 2026